Steps to Build your Villa or Home

Steps to Build your Villa in Bali Indonesia, you will learn here the procedure of construction of your future home.

Step 1: Find the suitable land.

If your home project is already fully defined, pay attention to build your house / villa in the right location.

If you already bought your land plot before, you will have to adapt your building project to the constraints of the land (soil composition, orientation ...).

Finding the Location

Select a desirable place for your house.

Select the property on which you are going to build and purchase it

Have the property surveyed and the footprint of the house located

Consider access issues

Step 2: The first meeting.

Whether by the advice of a friend, the sight of panels on our building sites, a search from a directory or even from our website, we 're ready any time to meet you and discuss about your project.

The first meeting will be the opportunity for us to know about your project and your budget to be able to develop a first draft of your request together.

We invite you to fill the form in the Contact section to give us the maximum information even before our first meeting.

Designing Your Home

Design your own home with us and consult our architect

Design the living spaces

Design the utility areas with an eye toward function

Place windows with the maximum energy efficiency in mind

Prepare to tackle water drainage issues with the proper design

Step 3: The building permit

The building permit can be achieved once we and the design office have succeeded to harmonize ideas and budget.

The building permit filed within three months minimum is required to confront this project in view of the Indonesian Administrations.

When we will apply your building permit, we will get a receipt with your building permit number that can also be useful to finalize your financing plan.

Getting the Necessary Permits

Secure a construction loan

Get construction insurance

Secure the proper construction permits

Prepare an Estimated Cost Breakdown

Step 4: Start of the construction

Our team will carry out the implementation of the work to avoid any errors which could lead to heavy complication thereafter. After the cast foundations will be dried, the foundation can be laid.

Earthworks correspond to the first phase of work for the building structure.

These include all the handwork and work that will modify temporarily or permanently the shape of the land.

Breaking Ground

Lay the foundation

Pour the concrete foundation on which to build

Set up building lines

Step 5: The setting out of water and out of air

Stage of completion corresponding to the protection of the site and that is to make the building waterproof and weather-sealed to the winds: in other words, it is at this stage that the roof establishment and installed doors and windows.

The elevation of masonry had been monitored at critical points, the frame and the cover being made.

Building the Walls and Roof

Frame the walls of your house

Plumb the walls and brace them securely

Lay out the marks for setting your roof trusses.

Set each truss in the correct location

Nail a sub-facia board to connect the ends of each rafter

Install roofing felt for use as a moisture barrier

Install the exterior siding and exterior features such as windows and doors

Install your final roof

Step 6: The Choice of Finishes

The second stage of construction, less spectacular, defined as the "second work" consists of the inner construction of the villa / house.

Positioning walls, choice of interior doors and sanitary, choice of flooring must be analyzed point by point to not make any mistakes in decorating that would penalize the quality of life for many years.

Starting on the Interior

Install pipes for potable water, waste drains, and drain vents in walls

Install HVAC (air conditioning and heat) ductwork, air handlers, and refrigerant piping

Rough-in electrical outlets

Install insulation

Install your ceilings

Step 7: Installing the Essentials

Installation of the minimum furniture, kitchen set, bathroom set, painting...

Install plumbing fixtures as necessary

Install the wall board or paneling on interior walls

Place wall trim

Caulk, paint, and install wall coverings on any walls that require it

Install cabinets and other mill work

Install flooring

Install appliances and have the utilities turned on

Step 8: Delivery of the keys

This is the end of the project of construction, you will be now able to organize the final design with installation of your furniture and decoration.

This is the acceptance by the client, assisted or not by the architect of the project.

The receipt date marks the end of construction insurance and the departure of the completion guarantee for a year.

 

Buy the landBuy the land first meeting contractorfirst meeting contractor building permitbuilding permit Beginning Building ProjectBeginning Building Project

 

InsulationInsulation FinishingFinishing The keysThe keys the villa builtthe villa built

 

 

Tags: Bali Contractor - Buiding and Construction Villa, Bali Contractor, Building and construction bali, build villa bali, bali villa contractor, build a villa in bali, best contractor in bali, find contractor in bali, bali best contractor, bali build a villa, bali villa build, The Steps to Build your Villa, Steps to Build your Villa or Home

Newsletter


I agree to Terms of Use

Sign up

Bali Real Estate Partners

Immobilier Bali - Kingimmo.com